Shandong Beichen Xinjiang HVAC Exhibition on the first day of the wonderful hit!


Release time:

2024-04-11

On March 29, the 2024 Xinjiang HVAC Exhibition arrived as scheduled. This event attracted professionals from all over the country to exchange and cooperate. Shandong Beichen with high/low pressure electrode hot water boiler, High/low pressure electrode steam boiler, intelligent heating, waste heat utilization and other products stunning debut. On the first day of the exhibition, the scene was very lively, attracting many new and old customers to watch the exhibition and negotiate, and talk about cleaning together.

The heating industry develops a new future.

Heavy star exhibits, meticulous technical explanation, thoughtful and enthusiastic service, the company booth on-site audience in an endless stream. This exhibition shows in depth the scientific research achievements of Shandong Beichen for many years,

The company's technology accumulation and innovation were demonstrated to the outside world. At the same time, everyone fully affirmed the company's technology accumulation, research and development results and project cases in the field of clean energy.

In the future, the company will continue to adhere to the road of innovation, innovate sales models, and develop new technologies to achieve sustainable and healthy development, and build a new set of clean wisdom that achieves multi-energy complementarity and demand-supply interaction.

energy service system.

 

Electrode boiler series products

Low pressure electrode steam boiler system

11

Application fields: food processing, printing and dyeing, pharmaceutical, clothing ironing, medical institutions and other scenes with steam demand
System configuration: low-voltage electrode steam boiler, feed water pump, sewage cooler, PLC control cabinet, power cabinet;
Steam pressure: 0.8MPa-1.3MPa
Power: 0.4t/h-0.8t/h
Voltage: 380V
Weight: 400KG
Dimension of Equipment: 1100*2100*2100(mm)

 

Low pressure electrode hot water boiler system

11

Application: enterprises and institutions with heating demand, hotels, office buildings, hospitals, schools and urban complexes
System configuration: low voltage electrode hot water boiler, feed water pump, water softener and control system;

Working Voltage: Ordinary Pressure
Operating Temperature: 45℃-85℃
Power: 200KW-1000KW
Voltage: 380V
Hauled weight: 395KG-1590KG
Dimension of Equipment: 1000*1500*1900(mm)

 

Electrode boiler series products

High pressure electrode steam boiler system

11

Applications: Industrial steam supply, power plant start-up boiler;
System configuration: high pressure electrode steam boiler, feed water pump, internal circulation pump, automatic dosing device, water treatment device, deaerator, blowdown expansion vessel and control system.

Steam pressure: ≤2.5MPa
Steam power:4.3t/h-85.7t/h
Power: 3MW-60MW
Voltage: 10KV
Equipment size: 4000*4150*8050(mm)

 

High pressure electrode hot water boiler system

11

Application fields: large-scale civil and co-construction of clean heating, domestic hot water, valley electricity heat storage, power plant peak regulation;
System configuration: high pressure electrode boiler unit, heat storage tank, heat storage/heat pump unit, external board replacement unit, water supply system.

Working pressure: Normal pressure/Pressure-bearing
Power: 1MW-60MW
Voltage: 10KV
Equipment size: 2840*2850*7300(mm)

 

Different categories of representative projects

11

11

Smart heating project case

School time division heating project

For the school to implement energy-saving campus heating scheme, namely high voltage electrode boiler + heat storage mode, heat network scheduling system, pipe network balance system, time-sharing and zoning control energy saving system, greatly reduce the annual heating cost and emissions. The main projects include Zhangbei Chenglong School, Huangtian Middle School and other projects, with a cumulative area of nearly 20 million square meters by the end of 2019.

11

Liangshan Jason thermal intelligent heat network monitoring platform

Supply: Smart iot balance valve, heat exchange station transformation
Transformation contents: unattended heat exchange station control system, climate compensation control system, dynamic balance regulation of secondary pipe network, video surveillance system, intelligent heat network dispatching center construction, etc., and transformation of 42 heat exchange stations.
Transformation effect: the project is completed on time and in accordance with the quantity, and has been praised by customers, saving a lot of manpower and material resources for customers, and the comprehensive energy saving rate is more than 30%.

11

1.Aim: 
· System overheating
· Improve heating quality and comfort
· Extended equipment use
2.Solvable:
· Water imbalance of pipe network
· Uneven cold and hot temperature at room temperature
· Overall system energy saving
3.Realizable:
· Integrated heat source control
· Intelligent heat supply network
. Terminal informatization