Notice on Promoting and Learning the Experience and Practices of China National Heavy Duty Truck Group on Power Demand Side Management
Release time:
2018-10-11
Each county district economic and information bureau, high-tech zone science and technology economic bureau, key enterprises:
Since the province began to implement orderly power consumption on July 31, the province's power load gap has reached a maximum of nearly 8 million kilowatts. In the past month, the city's power load has hit five new highs. On August 7, the city's highest power load reached 6.109 million kilowatts, an increase of 6.78 percent over the same period last year and an increase of nearly 400000 KW over 2017. More than 700 users participated in the orderly use of electricity, which had a great impact on the production of industrial enterprises in our city, and the situation of "welcoming the peak and summer" was grim. According to the influence of objective factors such as climate change, the sharp increase in electricity consumption for air conditioning in business districts and the lag in the construction of power units, the "overall surplus and local shortage" of electricity will become normal in the coming period.
Through the power demand side management work, China National Heavy Duty Truck Group in our city has not only effectively reduced the peak power load, weakened the impact of "peak summer" on production, but also achieved considerable economic benefits. Now forward its advanced experience, hoping that all counties and districts will publicize and promote the experience of Sinotruk to key power consumption enterprises within their jurisdiction, encourage enterprises to strengthen power demand side management, reduce the impact of "peak summer and orderly use of electricity" on enterprise production, and ensure the development of real economy in our city.
It is hoped that all key enterprises will deeply study the relevant experience of Sinotruk Group, strengthen power demand side management according to their own reality, reduce production costs, improve their competitiveness, and achieve more economic benefits.
Annex: China National Heavy Duty Truck Group strengthens power demand side management and continuously improves power management level
Jinan Economic and Information Commission
August 13, 2018
China National Heavy Duty Truck Group strengthens power demand side management and continuously improves power management level
In recent years, China National Heavy Duty Truck Group has actively carried out the exploration and practice of power demand side management, in-depth research and utilization of the national power system reform policy, scientifically carried out the construction of energy storage projects and platform projects, reduced the peak load by nearly 17000 KW, and achieved better economic benefits And social benefits. In 2016, the electricity expenditure was reduced by 38.54 million yuan year on year. In 2017, the economic benefit was 32.21 million yuan. In the first half of 2018, the economic benefit was 8.42 million yuan. In 2017, it was awarded the AA-level evaluation of power demand side management and the title of power demand side management demonstration enterprise of the Ministry of Industry and Information Technology.
1. improve the utilization of valley electricity and reduce the cost of electricity.
By adjusting the process and adopting technical means, we will give full play to the function of peak-valley electricity price difference and continuously improve the utilization rate of valley electricity. In 2016, valley electricity consumption accounted for 32.81 percent of all energy consumption, an increase of 0.56 percentage points over the same period last year and 3.76 percentage points higher than in 2013. The electricity expenditure was reduced by 12.6 million yuan over the same period last year, and 4.35 million yuan in 2017. The main measures are as follows:
One is to avoid peaks and valleys and increase electricity consumption during valleys. Through the introduction of internal incentive policies, the production units are calculated according to the time-of-use electricity price, and the production units are encouraged to ensure the completion of orders on schedule, through reasonable arrangements for production, improve the proportion of electricity consumption in the Pinggu period, and meet the standards to be rewarded. Heavy truck manufacturing enterprises are typical discrete production units, many types of processes, long production chain, each process can be organized according to their own characteristics of production, through the casting and forging, coating, welding and other major electricity processes of flexible arrangement, scientific staggered electricity peak period, increase the valley when electricity. Each production unit arranges high-power electrical equipment (molten iron melting furnace, heat treatment equipment, shot blasting machine, coating line, etc.) for production in the Pinggu period, especially the casting and forging center and the precision casting processing department of the component manufacturing department. During the off-season of production, all the iron (steel) water melting electric furnaces will be adjusted to the valley for production, thus greatly reducing the electricity price. In the first half of 2018, in the face of the Group's continuous production volume and the increasing difficulty of peak shifting of key energy-using units, the utilization rate of valley electricity, the two largest electricity-using units of the casting and forging center and the truck company, still increased by 0.25 and 0.19 percent year-on-year.
The second is the valley electricity storage cold storage heat, to achieve the role of peak shifting and valley filling. Invest in the construction of electricity storage projects, transfer peak load, effectively reduce the peak power utilization rate. Jinan Power Department of the Group invested 3.75 million yuan in 2016 to implement the water storage and air compressor waste heat utilization project, of which the water storage part invested 2.2 million yuan and was put into operation in May 2017 for a total of 140 days in 5 months, using 693000 kWh of trough electricity and saving 388500 yuan of electricity. Using valley electricity can reduce the electricity load by 1041Kw during peak hours, reduce the electricity demand by 40000 yuan per month and reduce the electricity demand by 200000 yuan in 5 months. Together with the benefits generated by the waste heat utilization part, minus operating costs, the annual cost savings can be 1.834 million yuan. In 2017, Jinan Power Department invested another 15.43 million yuan in the capacity expansion project to implement the ground source heat pump water storage (heat) project, which was completed in March 2018. The project can save 1095 tons of standard coal, save 6000 tons of water, reduce carbon dioxide emissions by 2730 tons, and achieve economic benefits of 4 million yuan.
2. adapt to the two-part electricity price and reduce the basic electricity bill.
In the second half of 2016, the National Development and Reform Commission issued the "Notice on Improving the Implementation of the Basic Electricity Price for Two-Part Electricity Price Users" (FGPA Price [2016] No. 1583), changing the basic electricity price billing method from "year" To "quarter", if the basic electricity bill is calculated and collected according to the maximum demand method, the approved value change cycle will be changed from "half a year" to "month". Through the effective use of this policy, the production units in Jinan area of CNHTC switched to the demand payment method, and the basic electricity charge decreased by 7.16 million yuan in 2016 compared with the same period last year, and 14.59 million yuan lower than that in 2014. In 2017, the basic electricity bill was reduced by 5.34 million yuan year on year. In the first half of 2018, the basic electricity bill was reduced by 2.1 million yuan year on year. Its main approach has the following two aspects:
One is to reduce the capacity of the article, improve the load rate. The specific approach is to reasonably equip the transformer, or use the secondary crossover mode to improve the load rate of some transformers, and disable some transformers. At present, the basic electricity charge standard implemented in Shandong Province is: capacity charge 28 yuan/KVA, demand charge 38 yuan/KW,28/38=0.73, which becomes the balance value of the two charge standards. For load rate higher than 73%, it is appropriate to pay according to capacity, and for load rate lower than 73%, it is appropriate to pay according to demand. Through the reasonable allocation of transformers, Jinan Power Department's basic electricity charge in 2016 was 1.6 million yuan lower than that in 2015 and 5.75 million yuan lower than that in 2014. Rubber and plastic parts companies reduced the installed capacity by 2230KVA by balancing the load, saving the basic electricity charge by 750000 yuan per year. Heavy Duty Truck Group has concentrated nine secondary production units such as casting and forging center, power department and parts department in Zhangqiu Industrial Park. There are multiple access points. The next step will be to further reduce the basic electricity charge by optimizing the overall power supply allocation. It is expected that the basic electricity charge can be reduced by at least 4.5 million yuan per year.
The second is to work hard to control the demand and reduce the load peak. In the company's internal implementation of reasonable electricity related regulations, through reasonable arrangements for production, to avoid large electrical equipment at the same time start, effectively reduce the load peak. The Power Department of Heavy Duty Truck Group negotiates with all units in the park to implement the demand electricity price, convenes resident enterprises to dispatch the peak power consumption, adjusts the lower limit of the rated demand implementation demand, I .e. 40% of the total capacity, and reduces the basic electricity charge by 5.75 million yuan compared with 2014 and 1.6 million yuan compared with 2015. Rubber and plastic parts company reduces the installed capacity by 2230KVA by balancing the load, saving the capacity cost by 750000 yuan per year. Commercial vehicle company and Haoke company formulate "high power consumption equipment wrong start management system", set "equipment wrong start plan", fill in "wrong start record" and regularly check. According to the previous load situation, the parts department adjusted the high-power equipment to the production in Pinggu period, and reduced the distribution load of Beisi Factory to 6400KW (40% of transformer) as the maximum demand. In order to prevent the maximum demand from being exceeded, the maximum demand was set for each processing department, and the high-power equipment of each processing department was required to start at the wrong time. The distribution room monitored the load of each processing department and the total load of the line, when the demand is near, inform the relevant processing department in time to take measures to avoid exceeding the demand.
3. actively participate in direct transactions with large users to obtain more preferential policies
"Direct power trading" is the national policy to promote the reform of the power system, which is mainly committed to reducing the burden of electricity charges for large industrial users and reducing the operating costs of the real economy. Heavy Duty Truck Group took part in direct trading of large users from 2014 and took the lead in cross-provincial direct trading of electricity in the province in 2016. In 2014 and 2015, a total of 0.3 billion kilowatt-hours of electricity were traded, reducing electricity expenditure by 4.5 million yuan, 21.03 million yuan in 2016 and 20.66 million yuan in 2017. Its main approach has the following two aspects:
First, master the rules of direct trading, the implementation of policy realization. Conscientiously implement the spirit of provincial and municipal power market construction, organize special personnel to study and actively participate, "make profits as soon as possible and make the most profits". At the beginning of 2016, Sinotruk Group participated in the direct cross-regional transaction of Yindong DC. It chose the centralized bidding method to clinch a full transaction of 0.2 billion kilowatt-hours, with a price reduction of 0.065 yuan -0.068 yuan per kilowatt-hour. The remaining electricity participated in the direct transaction in the province, with a price reduction of 0.05 yuan per kilowatt-hour. In the first half of 2018, in the face of the situation that coal prices continue to run at a high level and the complexity of direct electricity transactions has greatly increased, electricity charges are still discounted by 3.51 million yuan through cross-regional transactions and 1.7 million yuan through intra-provincial transactions.
The second is to learn the new national electricity reform policy and reduce the cost of electricity. Always pay attention to the policy trends of the national power system reform, unite with major power users in the province, and work closely with power sales companies, especially carefully study the recently issued relevant policies of power sales companies, and organize production units within and outside the province and various spare parts suppliers, Form a team, and strive to set up your own power sales company, with the idea of group buying in order to further reduce the cost of electricity.
4. strengthen the construction of power demand side management platform, strengthen the ability of load control
The power demand side management platform is to improve the control ability of power load with the help of modern information means, expand the energy performance into unit product electricity charge, and finally realize the reduction of basic electricity charge, the improvement of valley electricity utilization rate, the improvement of load rate and the control of peak demand by realizing the consciousness change from "energy saving" management to "money saving" management. Its main approach has the following two aspects:
One is to continuously strengthen the construction of the platform and enhance the ability to control the power load. After the bridge box company of heavy truck group took the lead in building the power demand side management platform and achieved actual results, in 2016 heavy truck group and other seven production units completed the construction of the power demand side management platform, so far, the main production units in Jinan area have established the platform. The new management platform covers more than 75% of the key electrical equipment (production lines). At the same time, it continuously enriches the functions of the platform. On the basis of effectively managing the demand and reducing the electricity charge for the demand, it strengthens the monitoring of the power factor. According to the provisions of the grid electricity price that the peak power factor is higher than 0.95 and lower than the 0.95 additional electricity charge, the peak power factor is always kept above 0.95 through the management platform. From 2014 to 2016, every year, the reward for effective electricity adjustment is above 1 million yuan. In 2017, the reward for effective electricity adjustment is 1.86 million yuan. In the first half of 2018, the reward for effective electricity adjustment is 1.11 million yuan.
The second is to carry out energy performance control and promote cost reduction and efficiency enhancement at the production process level. Use the monitoring, measurement and analysis functions of the platform's energy management system to measure and control the set energy performance parameters in a timely and effective manner. Especially for key energy-using units, management at the hourly and shift levels is realized, and energy performance is extended to the electricity charge per unit of product. Through the platform system to calculate the power load curve, to find out the corresponding relationship between the output of each production unit and the electricity load, to cut the peak to fill the valley to reduce the demand for electricity as the principle, the local production organization plan to adjust the proposal, when the load is found to exceed the demand set value, make a timely power scheduling plan. At the same time, the power factor, three-phase voltage imbalance, harmonics and other power quality detection functions of the platform are used to study the impact of power quality problems on vehicle production, and further strengthen power quality detection and management.